3D Printed FRP-Concrete-Steel Composite Hollow Core Bridge Column



University

Missouri University of Science & Technology

Principal Investigator
Chenglin Wu
PI Contact Information
wuch@mst.edu
Funding Source(s) and Amounts Provided
USDOT: $37,433
MS&T: $37,433
Total Project Cost
$ 74,866
Agency ID or Contract Number
69A3551747107
Start Date
01/01/2019
End Date
5/31/2021
Brief Description of Research Project
A 3D printed hollow bridge column structure is proposed with a concrete shell sandwiched between FRP and steel tubes. The microstructure and texture of the FRP tubes will be controlled by the 3D printing technique to enhance the interfacial bonding with concrete. Both modeling and experiments will be conducted to achieve the optimum multilayer design for enhanced structural performance under seismic loadings.
Describe Implementation of Research Outcomes
Impacts/Benefits of Implementation
Web Links
Modal Orientation
  • Bridges