NDOR Second Generation Precast Panel

Final Report
click to download report


Researchers

  • Principal Investigator: Maher Tadros (mtadros1@unl.edu 4025544842)
  • Project Status
    Complete
    Sponsors & Partners
  • Nebraska Department of Roads
  • Abstract
    The majority of today's bridge decks are built using cast-in-place concrete construction. This is due to the perceived low initial cost and constructor familiarity with the system. This research report describes the design, details, and construction of an innovative full-depth precast concrete bridge deck system - the Second Generation NUDECK (Nebraska University Deck). The quality of this system is far superior to castin-place construction. Cast-in-place concrete bridge decks experience cracking shortly after construction due to differential creep and shrinkage with the supporting beams. This leads to bridge deck deterioration; a problem that is not experienced with the virtually crack-free prestressed NUDECK made from high performance concrete. Rapid construction and minimizing the impact to drivers are two major demands toward our transportation industry. Precast bridge deck panels remove the construction operation from the jobsite and replace it with bridge deck installation. This eliminates the time spent on forming, concrete placing, and concrete curing. In addition, it increases worker and driver safety. Applications of this system to two of Nebraska's bridges are presentedin this report
    Project Amount
    $ 150,560